CONM 311 - Formwork-Temp Structures


Design, erection, use and removal of temporary structures used in the construction industry with an emphasis on concrete formwork. Basic rigging operations introduced. Typically Offered: Fall, Spring.
Level: UG
Credit Hours: 3

Prerequisite CONM 212 /D- And CONM 221 /D- And CONM 222 /D- And CONM 225 /D- And (MATH 120 /C- Or MATH 126 /C- Or MATH 130 /C- Or MATH 132 /C- Or MATH 216 /C- Or MATH 220 /C- Or MATH 230 /C- Or A02/26 Or S12/610) And PHYS 211 /D-
Ferris Equivalencies:

Department: SBE



Print-Friendly Page (opens a new window)